1. Home
  2. Docs
  3. Technical Manual
  4. Choose type of project
  5. A project can consist of one or more ‘calculations’

A project can consist of one or more ‘calculations’

The final report will have separate appendixes for each calculation, which provides the opportunity to specify savings and potentials besides
the overall results.

The reason for separating into more than one calculation could be:

  • You need the report to be divided into locations/categories/multiple project owners etc.
  • Different installations. Ex. A data center installation and a workplace IT installation, which requires two different calculation types.

For more info, see the following.